Project name項(xiàng)目名稱(chēng) | Houxi Beam Making Field of Fuxia Railway福廈鐵路后溪制梁場(chǎng) |
Construction unit建設(shè)單位 | China Railway Bridge Group Co., Ltd.中鐵大橋局集團(tuán)有限公司 |
Project Description項(xiàng)目簡(jiǎn)介 | The three super bridges of Houxi, Xicai and Zhongyacheng of Fuxia Railway undertaken by the Houxi Beam Making Field of Fuxia Railway have a total length of 3.8 kilometers, and 104-hole main line box beams need to be erected. On August 7, 2008, the main lines of the three extra-large bridges were fully connected.福廈鐵路后溪制梁場(chǎng)承擔(dān)的福廈鐵路后溪、西蔡和中亞城三座特大橋總長(zhǎng)3.8公里,需要架設(shè)104孔正線(xiàn)箱梁。三座特大橋正線(xiàn)于2008年8月7日全面實(shí)現(xiàn)架通。 |
Supply product供應(yīng)產(chǎn)品 | Grouting material灌漿料 |