Project name項目名稱 | Jinjiang Shujie Road Phase II Project晉江疏解路二期工程 |
Construction unit建設單位 | CCCC First Highway Engineering Bureau Co., Ltd.中交第一公路工程局有限公司 |
Project description項目描述 | Shujie Road is a convenient main road between Nan'an, Jinjiang and Shishi cities and counties. It adopts the first-class highway standard, with a roadbed width of 50 meters and a designed driving speed of 80 km/h. The main line has a total length of 14.8 kilometers, of which 75% of the construction tasks of the first phase have been completed, and it is planned to be completed and opened to traffic in June next year. The second phase, which is currently being organized and implemented immediately, starts from the vicinity of Shanzai Village, Cizao Town, G324 Line, and ends at Ganshi Village, Neikeng Town, with a total length of 6.65 kilometers and an estimated investment of 250 million yuan. After the project is completed, it will be connected with the first phase, which is of great significance to promoting the rapid distribution of people and logistics at Jinjiang Station of Fuxia Railway, promoting the construction and development of Neikeng logistics area, and accelerating the development of magnetic stoves, Neikeng and even the central and western parts of Jinjiang.疏解路是南安、晉江、石獅市域縣際間的一條便捷主干道,采用一級公路標準,路基寬度50米,設計行車速度80公里/小時。主線全長14.8公里,其中一期已完成75%的建設任務,計劃明年6月建成通車。當前馬上組織實施的二期起于G324線磁灶鎮(zhèn)山仔村附近,終于內(nèi)坑鎮(zhèn)柑市村,全長6.65公里,估算投資2.5億元。項目建成后,將與一期連接,對促進福廈鐵路晉江站人流、物流快速集散,促進內(nèi)坑物流區(qū)建設發(fā)展,加快磁灶、內(nèi)坑乃至晉江中西部發(fā)展,具有重要意義。 |
Supply product供應產(chǎn)品 | Superplasticizer,squeezing material減水劑、壓漿料 |