Project name項目名稱 | EPC2 and EPC4 Contract Sections of the Reconstruction Project of the East Section of the Second Ring Road in Chengdu成都市二環(huán)路東段改造工程EPC2、EPC4合同段 |
Construction unit建設(shè)單位 | China 19th Metallurgical Group, Qionglai Highway and Bridge Engineering Co., Ltd.中國十九冶集團、邛崍市公路橋梁工程有限公司 |
Project Description項目簡介 | The project starts from the east side of the Beifu River Bridge on the Second Ring Road in the north, runs eastward from Commercial Avenue, North Railway Station, and Shuangqiaozi Interchange, and ends on the east side of the Nanfu River Bridge on the Second Ring Road in the south, with a total length of 13.1 kilometers. The main project contents include expressway system (viaduct), large-capacity bus rapid transit system (civil works, equipment purchase and installation), intelligent traffic management system (civil works), reconstruction and restoration of bottom roads and related ancillary works.該工程北起二環(huán)路北府河橋東側(cè),向東經(jīng)商貿(mào)大道、火車北站、雙橋子立交,南止二環(huán)路南府河橋東側(cè),全長13.1公里。主要工程內(nèi)容包括快速路系統(tǒng)(高架橋)、大容量快速公交系統(tǒng)(土建、設(shè)備購置和安裝部分)、智能交通管理系統(tǒng)(土建部分)、底層道路改造恢復(fù)及相關(guān)附屬工程。 |
Supply product供應(yīng)產(chǎn)品 | Squeezing agent壓漿劑 |